Electricity & Energy Business w/ Blend of Computers, Internet, Gadgets, Etc.


System Loss, Pilferage and Politics Can Set Electric Distribution Utilities to Bankruptcy

I hope MERALCO will not have the same fate as these two electric cooperatives; Read the entire entry …


Filed in: Distribution Utilities, MERALCO
Local date: August, 2008

Malaysia’s Energy Bill Calculation Considers the Lagging Power Factor Penalty

Sarawak Electricity Supply Corporation (SESCO) tariff rates and computation of electric energy shows a strict consideration of the lagging power factor at the demand side, whether it is commercial, residential, or industrial, in the electricity bill. (http://www.sesco.com.my/sesco/english/intransmission.html). Read the entire entry …


Filed in: Distribution Utilities, Computations and Methodologies
Local date: August, 2008

«Previous article in Distribution Utilities: Malaysia's Energy Bill Calculation Considers the Lagging Power Factor Penalty
«Previous article in MERALCO: What the Philippine Law Says about the System loss

Pages (1) :

Linkblog

Search This Site

 
Web www.jcmiras.net

.



Archives (99 posts)