This was the actual synchronization of 100 MW Pantabangan Hydro Plant. The procedure is quite simple; 1.) Run the turbine at equivalent synchronous speed. 2.) turn-on the excitation, and, 3) synchronize to the grid using Dark lamp method and synchroscope.